Čortanovci viaduct on the Belgrade – Budapest railway

Location: Čortanovci, Sremski Karlovci – Beška section
Project type: construction of a viaduct on the Belgrade – Budapest high-speed railway
Machinery used: BMD Kran Trans mobile cranes

Mobile cranes on the construction of the Čortanovci viaduct

The construction of the viaduct near Čortanovci, between Sremski Karlovci and Beška, is one of the most important infrastructure projects in Serbia. The structure spans the Danube floodplain and is part of the modernisation of the high-speed railway connecting Belgrade and Budapest.

Lifting and positioning structural elements

BMD Kran Trans took part in this project with its mobile crane rental services. Careful lift planning and modern machinery made it possible to lift and position the key structural elements safely and efficiently.

Work on difficult terrain

Work in a floodplain and on a long-span structure requires careful choice of crane position, radius and how the load is attached. For us, projects like this are an example of work where crane capacity, operator experience and organisation on site are equally important.

Project photos

Project video

Need a mobile crane for an infrastructure project?

Send us the basic site details: type and weight of the load, location and deadline, and we will propose the right machinery.